Cable Laying Test
DraftReference: RA-2026-Oy6szFUZ
Total Activities
2
High Risk
1
Medium Risk
1
Low Risk
0
📄 Method Statement
No method statement was uploaded for this assessment.
Risk Assessment Matrix
| SN | Activity | Hazard | Consequence | Groups Exposed | Controls | Initial Risk | Additional Controls | Residual Risk |
|---|---|---|---|---|---|---|---|---|
| 1 | Manual Test Activity | 1. Manual handling injuries 2. Slips and trips 3. Working at height | Personal injury, fractures, sprains | All site personnel | 1. Provide appropriate PPE 2. Conduct toolbox talks 3. Implement safe work procedures |
P
3
×
S
3
=
9
|
1. Regular inspections 2. Competent supervision |
P
2
×
S
2
=
4
|
| 2 | Electrical Work | 1. Electric shock 2. Arc flash 3. Fire hazard | Serious burns, fatality, equipment damage | Electricians, site personnel | 1. LOTO procedures 2. Insulated tools 3. PPE (arc flash suit) |
P
4
×
S
5
=
20
|
1. SWMS approval 2. Competent supervision 3. Emergency response plan |
P
2
×
S
3
=
6
|