fabrication installation of concrete

Electrical

Select from dropdown or type custom status

Current: UR - Under Review

📄 Document Management

Upload documents for different statuses

Click or drag to upload document for UR status

Supported: PDF, DOC, DOCX, Excel (Max 10MB)

No documents uploaded yet

Risk Assessment Matrix

SN Activity Hazard Consequence Groups Exposed Controls Initial Risk Additional Controls Residual Risk Actions
1
Complete HDPE Duct Infill
1. Vehicle movement and traffic hazards 2. Manual handling during loading/unloading 3. Uneven ground conditions
Personal injury, property damage
Site Personnel, Subcontractors, Public
1. Implement traffic management plan 2. Designated walkways 3. Mandatory PPE 4. Speed limit enforcement
P 3 × S 3
9
1. Comply with ADOSH SF CoP 27.0 2. Daily vehicle inspection 3. Toolbox talk
P 2 × S 2
4
2
Site mobilization and setup of temporary
Passing high-speed public traffic and moving site vehicles
Personal injury, property damage
Site Personnel, Subcontractors, Public
Approved TTM plan, high-visibility clothing (Class 3), physical water-filled/concrete barriers, advanced warning signs, and trained flagmen.
P 3 × S 3
9
Deployment of Truck Mounted Attenuators (TMA) and enforcement of reduced speed limit zone in coordination with local traffic authorities.
P 2 × S 2
4
3
Trench excavation and sub-surface ground preparation
Accidental strike on existing buried live electrical cables or gas utilities
Personal injury, property damage
Site Personnel, Subcontractors, Public
Utility mapping review, CAT & Genny cable avoidance scanning, and manual trial pits (pot-holing) prior to mechanical excavation.
P 3 × S 3
9
Mandatory Permit to Dig system, use of insulated hand tools near identified utilities, and continuous competent supervision.
P 2 × S 2
4
4
Uncoiling, handling, and positioning HDPE pipe
Sudden release of stored mechanical spring energy in coiled HDPE pipe
Personal injury, property damage
Site Personnel, Subcontractors, Public
Use of specialized pipe reeler/uncoiler frame, controlled strap cutting procedures, and establishing exclusion zones.
P 3 × S 3
9
Mandatory deployment of safety restraints/bands before unstrapping and wearing high-impact resistant safety glasses and gloves.
P 2 × S 2
4
5
HDPE pipe jointing via electrofusion and
High-temperature heating elements, hot molten plastic, and portable electrical generators
Personal injury, property damage
Site Personnel, Subcontractors, Public
Certified welding equipment, RCD-protected generators, heat-resistant safety gloves, and portable fire extinguishers nearby.
P 3 × S 3
9
Hot Work Permit implementation, provision of localized exhaust ventilation or respiratory protection (FFP3) in confined areas.
P 2 × S 2
4
6
Entry into underground chambers and manholes
Hazardous atmosphere (oxygen deficiency, toxic gases like H2S/methane), engulfment, or fall from height
Personal injury, property damage
Site Personnel, Subcontractors, Public
Confined Space Entry Permit, pre-entry 4-gas atmospheric testing, forced air ventilation, and tripod rescue system with harness.
P 3 × S 3
9
Continuous multi-gas monitoring during entry, dedicated trained top-person/standby monitor, and verified emergency rescue plan.
P 2 × S 2
4
7
Mechanical winch pulling of HDPE sub-ducts
High-tension winch wire snap, rotating capstans, and pinch/nip points
Personal injury, property damage
Site Personnel, Subcontractors, Public
Properly rated winching wire with calibrated weak-link swivel, emergency stop switches, and safety guards over rotating parts.
P 3 × S 3
9
Integrated load monitoring with automatic shut-off at peak tension limits and strict exclusion zones along the tension line.
P 2 × S 2
4
8
Duct proving (mandrel testing) and air
Uncontrolled high-pressure compressed air release and projectile ejection of foam pig or mandrel
Personal injury, property damage
Site Personnel, Subcontractors, Public
Calibrated pressure relief valves, secure containment/catcher cage at receiving duct end, clear exclusion zone enforcement.
P 3 × S 3
9
Mandatory Pressure Testing Permit, full-face protection shields for operators, and calibrated double-gauge manifolds.
P 2 × S 2
4
9
Underground Utility Surveying and Cable Detection
Encountering hidden live underground power cables or buried utilities during survey and marking
Electrocution, severe electrical arc burns, flash injuries, localized power grid disruption
Land Surveyors, Civil Engineers, HSE Inspectors, Groundworkers
Obtain valid Permit to Work (PTW) and Excavation Permit; Review cable route drawings; Perform CAT and Genny electromagnetic scan across the entire footprint; Mark identified utility paths clearly.
P 4 × S 5
20
Mandatory hand-digging of trial pits using insulated non-conductive hand tools prior to any mechanical activity; Re-scan area continuously during excavation.
P 1 × S 4
4
10
Mechanical Excavation for Concrete Foundations and Cable Trenches
Excavation sidewall collapse, contact with live utilities, heavy equipment strike
Engulfment, asphyxiation, crushing injuries, fatal electrocution, struck-by injuries
Excavator Operators, Banksmen, Groundworkers, Spotters
Implement 45-degree slope benching or certified shoring box systems for depths >1.2m; Maintain 3-meter safe distance from overhead and underground utility zones; Install hard physical barricades with warning signage around trench edges.
P 4 × S 5
20
Appoint a dedicated trained Banksman with high-visibility clothing; Daily pre-shift trench inspection by a competent HSE Supervisor.
P 2 × S 3
6
11
Rebar Cutting, Bending, and Off-site/On-site Fabrication
Flying metal debris, high-noise generation, protruding rebar ends, pinch points on benders
Lacerations, eye injuries/impalement, noise-induced hearing loss, finger amputation
Steel Fixers, Fabricators, Machine Operators, Nearby Personnel
Equip all open vertical rebar ends with high-visibility mushroom safety caps; Install safety guards on rebar cutters and benders; Wear cut-resistant gloves (Level 5) and impact safety glasses.
P 4 × S 4
16
Mandatory full-face shields during abrasive disc cutting; Provide double hearing protection (earplugs + earmuffs) in rebar fabrication yards.
P 2 × S 2
4
12
Formwork Shuttering Assembly and Erection
Protruding nails, falling shuttering panels, manual handling of heavy formwork components
Puncture wounds, head injuries, foot/hand crush injuries, acute musculoskeletal disorders
Carpenters, Helpers, Scaffolders, Riggers
De-nail timber immediately after removal; Team lifting mandatory for items >20kg; Wear safety helmets with chin straps, steel-toe boots, and heavy-duty leather gloves.
P 4 × S 3
12
Inspect formwork ties and bracing layout against structural engineering sign-off before concrete pour; Maintain neat stacking and staging areas.
P 2 × S 2
4
13
New Activity sdsadsdsadsadsadsadsadsad
Identify hazards here
Describe consequences
All personnel
List control measures
P 3 × S 3
9
Additional controls
P 2 × S 2
4