Edit Risk Assessment
Reference: RA-2026-CbskRMVA
Route Marker Installation
Electrical
Select from dropdown or type custom status
Current: Draft
⚡ Processing comments in background...
📄 Document Management
Upload documents for different statusesClick or drag to upload document for draft status
Supported: PDF, DOC, DOCX, Excel (Max 10MB)
No documents uploaded yet
Risk Assessment Matrix
| SN | Activity | Hazard | Consequence | Groups Exposed | Controls | Initial Risk | Additional Controls | Residual Risk | Actions |
|---|---|---|---|---|---|---|---|---|---|
| 1 |
Complete HDPE Duct Infill
|
1. Vehicle movement and traffic hazards
2. Manual handling during loading/unloading
3. Uneven ground conditions
|
Personal injury, property damage
|
Site Personnel, Subcontractors, Public
|
1. Implement traffic management plan
2. Designated walkways
3. Mandatory PPE
4. Speed limit enforcement
|
P
3
×
S
3
9
|
1. Comply with ADOSH SF CoP 27.0
2. Daily vehicle inspection
3. Toolbox talk
|
P
2
×
S
2
4
|
|
| 2 |
Site mobilization and setup of temporary
|
Passing high-speed public traffic and moving site vehicles
|
Personal injury, property damage
|
Site Personnel, Subcontractors, Public
|
Approved TTM plan, high-visibility clothing (Class 3), physical water-filled/concrete barriers, advanced warning signs, and trained flagmen.
|
P
3
×
S
3
9
|
Deployment of Truck Mounted Attenuators (TMA) and enforcement of reduced speed limit zone in coordination with local traffic authorities.
|
P
2
×
S
2
4
|
|
| 3 |
Trench excavation and sub-surface ground preparation
|
Accidental strike on existing buried live electrical cables or gas utilities
|
Personal injury, property damage
|
Site Personnel, Subcontractors, Public
|
Utility mapping review, CAT & Genny cable avoidance scanning, and manual trial pits (pot-holing) prior to mechanical excavation.
|
P
3
×
S
3
9
|
Mandatory Permit to Dig system, use of insulated hand tools near identified utilities, and continuous competent supervision.
|
P
2
×
S
2
4
|
|
| 4 |
Uncoiling, handling, and positioning HDPE pipe
|
Sudden release of stored mechanical spring energy in coiled HDPE pipe
|
Personal injury, property damage
|
Site Personnel, Subcontractors, Public
|
Use of specialized pipe reeler/uncoiler frame, controlled strap cutting procedures, and establishing exclusion zones.
|
P
3
×
S
3
9
|
Mandatory deployment of safety restraints/bands before unstrapping and wearing high-impact resistant safety glasses and gloves.
|
P
2
×
S
2
4
|
|
| 5 |
HDPE pipe jointing via electrofusion and
|
High-temperature heating elements, hot molten plastic, and portable electrical generators
|
Personal injury, property damage
|
Site Personnel, Subcontractors, Public
|
Certified welding equipment, RCD-protected generators, heat-resistant safety gloves, and portable fire extinguishers nearby.
|
P
3
×
S
3
9
|
Hot Work Permit implementation, provision of localized exhaust ventilation or respiratory protection (FFP3) in confined areas.
|
P
2
×
S
2
4
|
|
| 6 |
Entry into underground chambers and manholes
|
Hazardous atmosphere (oxygen deficiency, toxic gases like H2S/methane), engulfment, or fall from height
|
Personal injury, property damage
|
Site Personnel, Subcontractors, Public
|
Confined Space Entry Permit, pre-entry 4-gas atmospheric testing, forced air ventilation, and tripod rescue system with harness.
|
P
3
×
S
3
9
|
Continuous multi-gas monitoring during entry, dedicated trained top-person/standby monitor, and verified emergency rescue plan.
|
P
2
×
S
2
4
|
|
| 7 |
Mechanical winch pulling of HDPE sub-ducts
|
High-tension winch wire snap, rotating capstans, and pinch/nip points
|
Personal injury, property damage
|
Site Personnel, Subcontractors, Public
|
Properly rated winching wire with calibrated weak-link swivel, emergency stop switches, and safety guards over rotating parts.
|
P
3
×
S
3
9
|
Integrated load monitoring with automatic shut-off at peak tension limits and strict exclusion zones along the tension line.
|
P
2
×
S
2
4
|
|
| 8 |
Duct proving (mandrel testing) and air
|
Uncontrolled high-pressure compressed air release and projectile ejection of foam pig or mandrel
|
Personal injury, property damage
|
Site Personnel, Subcontractors, Public
|
Calibrated pressure relief valves, secure containment/catcher cage at receiving duct end, clear exclusion zone enforcement.
|
P
3
×
S
3
9
|
Mandatory Pressure Testing Permit, full-face protection shields for operators, and calibrated double-gauge manifolds.
|
P
2
×
S
2
4
|
|
| 9 |
Pre-excavation scanning and utility route survey
|
Unidentified underground live high/medium voltage electrical cables and utilities
|
Electric shock, electrocution, severe arc flash burns, structural power disruption
|
Surveyors, Cable Avoidance Tool (CAT) operators, site supervisors
|
Obtain current utility drawings; perform mandatory Cable Avoidance Tool (CAT) and Signal Generator (Genny) scanning; mark identified cable lines with ground spray paint; issue Dig Permit prior to work.
|
P
4
×
S
5
20
|
Enforce hand-digging trial holes along marked routes; implement daily supervisor sign-off on Permit to Dig; mandate zero mechanical digging within 500mm of identified live services.
|
P
1
×
S
5
5
|
|
| 10 |
Loading, transport, and offloading of concrete route markers and posts
|
Heavy manual lifting, unstable loads, awkward postures, and sharp edges
|
Musculoskeletal disorders (MSDs), spinal injuries, crushed hands or feet, lacerations
|
Lorry drivers, logistics crew, groundworkers
|
Utilize mechanical lifting aids (vehicle cranes/tail lifts) where feasible; conduct team lifts for items over 20kg; wear cut-resistant gloves and steel toe safety boots.
|
P
4
×
S
3
12
|
Provide pre-task manual handling refresher training; restrict maximum single-person manual lift to 25kg; inspect all lifting gear and slings prior to use.
|
P
2
×
S
2
4
|
|
| 11 |
Vehicle positioning and working near live public roadways / highways
|
Passing third-party vehicular traffic, low-visibility conditions, reversing vehicles
|
Severe collision, personnel impact causing critical injuries or fatality
|
Field technicians, traffic marshals, public road users
|
Implement Temporary Traffic Management (TTM) in accordance with Chapter 8 / local roadwork standards; wear High-Vis clothing (Class 3); operate amber warning beacons on all work vehicles.
|
P
3
×
S
5
15
|
Deploy trained vehicle banksmen for all reversing maneuvers; set up physical cone barriers and warning signage at appropriate safe stopping distances.
|
P
1
×
S
4
4
|
|
| 12 |
Hand digging foundation holes for marker post installation
|
Striking hidden underground electrical cables with sharp hand tools, buried sharp objects
|
Electrical arc flash, severe electric shock, puncture wounds, localized hand injuries
|
Excavation operatives, groundworkers
|
Use fully insulated non-conductive hand excavation tools (rated to 1000V, BS EN 60900); excavate carefully using soft-dig techniques (e.g., digging side-to-side, not pitching down); wear dielectric boots.
|
P
3
×
S
5
15
|
Continuous scanning with CAT tool as excavation progresses vertically; halt work immediately and report if unidentified tiles, warning tape, or concrete slabs are struck.
|
P
1
×
S
4
4
|